Skip to content
Octopus Twin
Buildings, Hotels & ResortsGen 3 · Digital Twin

Building Twin · HVAC

A 13-level A-grade office tower from rooftop cooling towers to the basement chiller room. One physics model runs 65 thermal zones, 13 floor AHUs, chillers, heat pumps and a 6 MWh chilled-water store in 60-second steps, with a fault-free baseline twin running alongside so every saving is measured, not claimed.

Building Twin · HVAC
VAV thermal zones
65
BACnet / Modbus points, Brick-tagged
1,063
less HVAC energy vs baseline, summer day
≈33 %
injected faults for FDD to find
6

The challenge

Building owners are sold HVAC optimisation on promised percentages. Without a reference, nobody can say what the building would have used anyway — and faults quietly erase the gains.

What we built

  1. One 60-second physics model for zones, AHUs, chilled-water loop, chillers, towers, heat pumps and storage
  2. A baseline twin with conventional control runs in lockstep, so savings are a measured difference
  3. Setpoint resets, demand-controlled ventilation, optimum start and off-peak storage as switchable strategies
  4. 88 devices and 1,063 points with Brick classes; fault detection on measured points only
  5. X-ray zones, sectional AHU, rooftop plant and a piped chiller room for walkthroughs

Outcome in the twin

On the summer design day the optimised strategy uses about a third less HVAC energy than the baseline twin; every injected fault is detectable from the points a real BMS would expose.

Technology

React Three FiberTypeScript physics engineBrick schemaKTX2 texturesVitest + headless Chrome

About this build

Fictional building and synthetic data; demonstration geometry, not verified BIM.

Have a system you want to see, question or rehearse?

Tell us about the site, the process and the decision. We will come back with what a twin could answer, which data it needs, and how fast a prototype can be in front of your team.